Driveway Project Journal July 10, 2020

In my last blog entry, I told you about a new project to upgrade and restore my driveway.  After 20 years, my driveway needs to be repaired. I have a have circular driveway (see photo) that starts at the road level at the north end of the property. The first part is downhill at a severe incline. At the bottom of the driveway, there are about 25 feet of level ground. The driveway completes the circular opening up at the start of the cul-de-sac.

On either edge of the driveway is 6X6X8 foot pressure-treated wood. They hold the gravel on the driveway in place. A friend from church was between waiting for his military transfer and was looking for work. He and his son rebuilt the borders and spread the new gravel. He did a great job. Unfortunately, it’s been almost 20-years; it’s time to update the driveway.

New Driveway Project

The project is moving forward. Following a suggestion from my brother John, this past week, I asked Sterling Rush, a member of my Saturday morning breakfast group and an architect, to take a look at my project plans. On Tuesday, he came over and looked at the driveway. He made some worthy suggestions, including using steel rebar’s to keep the railroad ties in place. He also suggested putting an extra layer of railroad ties on the downside of the driveway to prevent the gravel from going downhill.

Although I was hoping to get a company or magazine to help me with the cost of this project by letting me write a case history project article for a trade magazine, unfortunately, no one has responded. So, I’ve gone ahead and ordered the materials from Lowes. One change I made was to order 6 X 6 railroad ties for the bottom layers. I also ordered 6 X 4 railroad ties for the top layer. This way, I can use six-inch nails (spikes) to connect them. According to Lowes, the scheduled delivery date is later this month.

I also hired a couple of kids from church to assist in doing the work. A big thanks to Robert and Mona Tisler for allowing me to utilize their kids to lift a 6X6X8 foot pressure treated piece of wood. I’m going to be the foreman, guiding the work crew. Let others do the work. I’m an old fart and know my limitations.

AWAI Copywriting / Web Content

Meanwhile, I’ve started a new AWAI Copywriting / Web Content class. I’m still in the first section but have already learned several “interesting” ways to write sales emails. As I’m going through the class exercises, I’m using my website as a test. I’ve been starting the re-design of my website. This week I added new images to the front page slider. Check it out! In the coming days, I’m going to enhance other parts of the front page.

Along with taking care of Linda (which is a full-time job in itself), it’s been a full week.

To be continued …