Driveway Project Journal – July 1, 2020

Long-term Driveway Project

Today is the start of a new long-term Driveway project. As I did with my hip replacement earlier this year, I am going to keep a journal for my next project. After 20 years, my driveway needs upgrading.

I’ve been researching the cost of the materials, and it’s not going to be cheap. But I suspect it would be even more expensive if I hired a company to do the whole thing. Once I purchase the materials, I’ll have the contents delivered. I have some tools. I plan on hiring some temporary help. Do you think I’m going to try to lift a 6X6X8 foot pressure treated piece of wood? I’m going to be the foreman, guiding the work crew. Let others do the heavy lifting. As an “Old Fart”, I know my limitations.

Yes, I know this is a lousy attempt to see if I can get a company or magazine to help me with the cost of this project by letting me write a case history project article for a trade magazine. I’ve read them and helped write a few for the companies I was employed in.

Life with a New Hip

Since having my hip replaced in early January – many things have happened. I have a new office. Well, an upgrade, at least. In February, while I was recovering from my hip replacement surgery, I went ahead to replace my basement office floor. My office went from carpet to hardwood flooring. Now we have hardwood floors throughout the entire house.

As part of the upgrading of my office process, in the summer of 2019, I replaced the sliding glass door. For this part of the process, for almost a week, I had to move my entire office into a temporary storage unit sitting in my driveway. I threw out the old desk. I had it for twenty years – well, I liked it, it perfect for my needs as a writer-photographer – programmer – website designer – book author – digital photo-painter. My new desk is an Ikea top over small file cabinets. Well, as you can see, the project is finished and a resounding success.

I’m now going on to the next project.

 Project Overview

I have a circular driveway that starts at the road level at the north end of the property. The first part is downhill from the street at a steep decline of about 20 feet. At the bottom of the circular, there about 25 feet are leveling off of the level ground where we park our car. The driveway completes the circular opening back up opening at the start of the cul-de-sac.

Making up the border on either edge of the driveway is a set of 6X6X8 foot pressure treated piece of wood. They hold the gravel in the driveway in place. It was one of the major projects (after the first winter). A friend from church was waiting for his military transfer and was looking for work took on the project at the time. He and his son rebuilt the border and spread the new gravel. He did a great job. Unfortunately, it’s been almost 20 years. It’s time to update the driveway. Well, that is the project. Stay tuned to hear of the progress.

In the coming weeks, I hope to keep this journal with the idea of writing a “How I Updated My Driveway” article. Any companies or publishers interested?

To be continued….

P.B.S. Studios

As a feature and content writer/photography/digital painting company, P.B.S. Studios wrote and published over a hundred articles for newspapers, magazines, and online publications, I’ve also had many other photographs published as illustrations in commercial and textbooks publications. To see this and other articles, check out the publication section of www.pbsstudios.com

Digital Photo-Painter

P.B.S. Studios work displayed in shops, libraries, galleries, restaurants, commercial buildings (including Manassas City Hall) in addition as banners. Check out the gallery sections on my website, www.pbsstudios.com to see digital photo-paintings and other examples of my work.